Debated in Parliament on 19 Nov 2018.
Mr Lim Biow Chuan asked the Minister for Transport whether LTA supervises the resurfacing of roads each time contractors have dug holes in the roads to install wires, cables and pipes and, if so, what is the reason for poor resurfacing of the roads after the works are completed.
All contractors are required to reinstate roads after their works, based on standards stipulated in the Land Transport Authority's (LTA's) Code of Practice for Works on Public Streets. These standards include the International Roughness Index which is an international standard that measures the riding quality of roads. However, LTA has observed through its regular audit checks and public feedback, cases where contractors did not carry out these reinstatement works in accordance with LTA's requirements.
In such instances, LTA will enforce against these contractors and require them to rectify their reinstatement works. These errant contractors will also be fined up to $500 per infringement and penalised with demerit points. Contractors who chalk up more than 200 demerit points a month will be suspended from carrying out any new works.
Members of the public can call LTA's hotline to report instances of poorly resurfaced roads.