Debated in Parliament on 10 Jan 2017.
Mr Dennis Tan Lip Fong asked the Minister for Transport in respect of the recent signalling problems with the Circle Line caused by signal interference, what measures will be taken to ensure that commuters are not inconvenienced by the same signalling problems again.
The signalling problem experienced on the Circle Line was caused by a hardware malfunction on one of the trains. The faulty component has been replaced and the train has since been returned to service under close supervision.
Based on the findings, LTA will also develop targeted measures to prevent an occurrence of similar problems on both the Circle Line and North-East Line, which use older signalling systems. LTA is also exploring ways to improve the general resilience of these systems. This includes shielding the signalling antenna against spurious signals, incorporating a feature for a backup antenna if the primary one encounters interference, and improving the signal transmission protocol.
The newer signalling systems used for the Downtown Line, and to be installed for the North-South and East-West Lines and the Thomson-East Coast Line, would not be affected by the signalling problem experienced by the Circle Line as they have enhanced redundancy features to guard against signal interference.