Debated in Parliament on 8 Apr 2013.
Mr Alex Yam asked the Minister for Transport with the announcement of reversible traffic lanes for peak periods on the KJE, which stretches will be considered for the scheme.
LTA has engaged a consultant to study stretches of the KJE and PIE (near Jurong) that are suitable for reversible flow lanes. The study is still ongoing.