Debated in Parliament on 8 Apr 2013.
Mr Sitoh Yih Pin asked the Minister for Transport when the bridge that connects St Andrew's Village to flats in Potong Pasir can be repainted.
LTA has awarded a contract to repaint the existing footbridge near St Andrew's Village. The repainting of the footbridge commenced on 22 March 2013 and is expected to be completed by end April 2013.
Page: 156