Debated in Parliament on 14 Jan 2013.
Mr David Ong asked the Minister for Transport if he can provide an update on the improvements to manage and minimise flight delays in take-offs and landings at Changi Airport in light of the formation of a task force looking into this matter.
Changi Airport has experienced a sharp increase in air traffic movements in recent years. In 2011, aircraft movements at Changi Airport exceeded 300,000 for the first time, a growth of 14.5% over the previous year. The significant increase in air traffic movements had led to delays in aircraft arrivals and departures.
A Steering Committee comprising the Civil Aviation Authority of Singapore (CAAS), the Changi Airport Group (CAG) and the airport community was established in early 2012 to develop measures to address the situation and raise Changi Airport’s air traffic capacity, without compromising safety.
Several measures have been implemented. Changes were made to air traffic control procedures to improve the predictability of air traffic flows, which allows for a higher traffic throughput. Measures were taken to increase runway availability. These include reducing the duration of runway closures for inspections and maintenance through the use of more resources and technology. CAAS and CAG are also working with the airlines to reduce the time spent by aircraft on the runway after landing.
These capacity enhancement measures have yielded positive results. The on-time performance at Changi Airport has improved despite continued growth in air traffic in 2012. In the second half of 2012, the percentage of delay in aircraft departure declined by about 50% year-on-year, even as aircraft movements
Page: 145
grew by more than 5% during the same period.
Going forward, Changi Airport has capacity for continued growth. A recent study has concluded that Changi Airport will be able to raise its two-runway capacity by about 40% through further enhancements to air traffic control procedures and additional runway availability measures. The Changi 2036 Steering Committee will also make a decision soon on the civilian use of Runway 3, which will further increase Changi Airport’s runway capacity.