Debated in Parliament on 7 Jan 2025.
Mr Chua Kheng Wee Louis asked the Minister for Transport (a) what is the expected increase in peak-hour train frequency on the North-East Line (NEL) with the progressive addition of six new trains since July 2023 and the recent opening of the Punggol Coast MRT Station; (b) when will the increased frequency be implemented; and (c) what is the (i) maximum number of trains that can be operating on the NEL and (ii) minimum interval between trains based on current technical constraints of the NEL.
With the opening of Punggol Coast station and the addition of new trains serving the North East Line (NEL), the NEL will be able to support the operation of a maximum of 42 trains, up from 36 trains.