Debated in Parliament on 21 Mar 2023.
Mr Dennis Tan Lip Fong asked the Minister for Transport (a) what steps have been taken to ensure that the construction of Changi Airport Terminal 5 is in line with sustainability goals; and (b) whether steps are taken to future proof the development of the terminal against climate change.
Mr Speaker, on the Member's first question, the factsheet entitled "Enhancing Singapore's Connectivity; Securing our Future" which was released by my Ministry on 21 August 2022, includes details on how we are designing Terminal 5 (T5) to be a green and sustainable terminal building.
Changi Airport Group's 2022 Annual Sustainability Report addresses the second question. The Report describes measures that have been taken including the enhancement of the drainage network at Changi Airport, installation of tidal gates and raising the platform level at Changi East to 5.5 metres above mean sea level.
I have also given a Written reply to Dr Tan Wu Meng's Parliamentary Question on 13 September 2022 on the mitigating measures that have been taken to protect Changi Airport against the effect of higher temperatures. [Please refer to "Effect of Increased Temperatures from Climate Change on Changi Airport Operations", Official Report, 13 September 2022, Vol 95, Issue 68, Written Answers to Questions section.]
We will continue to monitor technological developments and review and enhance the measures for T5 to be green, sustainable and resilient to climate change.