Evaluation of Selective Door Operation Feasibility on North East Line to Boost Capacity
Low Wu Yang Andre asked if the Land Transport Authority (LTA) has assessed the feasibility of using Selective Door Operation (SDO) to allow longer train sets on the North East Line to increase capacity. Jeffrey Siow replied that the LTA found SDO unfeasible for this line, as it would necessitate longer dwell times at stations, leading to increased journey times and reduced system capacity. Implementing SDO would also require substantial modifications to depots and tracks to accommodate longer trains.